Wiggert & Co GmbH
Deutsche VersionEnglish versionVersión españolaVersion francaise

DWM Twin-Shaft Mixer

DWM Twin-Shaft Mixer

Our models

 DWM 1875

 DWM 4500

 DWM 2500

 DWM 6750

 DWM 3375

Mixer standard with upgraded highly wear-resistant armor plates for guaranteed exceptional long service life

Verbundpanzerauskleidung

  • Fast homogeneous mixing
  • Quick, complete discharge
  • Highly efficient and reliable with minimum maintenance
Automatic high-pressure mixer cleaning device speeds up end-of-day cleanup for added production time
Automatic high-pressure mixer cleaning device speeds up end-of-day cleanup for added production time

The powerful twin-shaft mixing action with twin counter-rotating shafts achieves maximum output capacity, minimum wear, shortest discharge time, and allows processing of aggregates up to 150 mm.

DWM mixers are particularly suited for the Ready-Mix and the precast industry where large volumes of high-quality concrete are demanded. The twin mixing shafts are supported on each end of the mixer by heavy-duty roller bearings and are fitted with highly wear-resistant arms and shovels made of cast steel.

Entleerschieber

The oversized discharge gate can be opened to any required degree and discharge rate via adjustable proximity switches.

The discharge gate is actuated by two reliable hydraulic cylinders that are mounted externally to avoid exposure to concrete.

Powerful rugged drive, intelligently engineered

Powerful rugged drive, intelligently engineered

The mixing shafts are driven by two heavy-duty motors, V-belts and gear reductions. An elastic coupling synchronizes mixing shaft rotation.

Mixer shaft bearings are purposefully isolated from the shaft seals. The bearings are always protected in the event of an unlikely shaft seal failure.

Automatische Zweikreis-Zentralschmierung

Automatic central lubrication system has two circuits for optimum lubrication of the shaft seals and bearings. Large grease reservoir is fitted with a low-level indicator.

++ NEWS ++

Successful modernization of an existing tower plant
Recently Wiggert company had to handle a special task: The modernization of an existing tower plant in which as much of the installed equipment should be reused. In addition, the comparably small aggregate storage should be enlarged.

Huge aggregate storage volume
Concrete batching and mixing plant with automatic scraper for huge aggregate storage volumes commissioned at the largest pipe manufacturing facility in North America

A member of

WiCo Group
Wiggert & Co. GmbH
Wachhausstr. 3b | 76227 Karlsruhe, Germany
Phone: +49 (0) 721 94346-0 | Fax: +49 (0) 721 402208
E-mail: info@wiggert.com